.jpg)
In 2017, La Santa Maria was built. The C-Class platform was part of the first ever IQuay C-Class System.
Later the same year, the system was in operation, as Naturgy Energy Group S.A. (then Natural Gas Fenosa) and ECOnnect Energy (then Connect LNG) made history with the world's first jettyless LNG transfer.
In 2021, Naturgy and ECOnnect joined forces with Gasum and Air Liquide Skagerak to complete another commercial LNG transfer at Herøya, logging flow rate and pressure data in the floating hoses to benchmark performance against traditional solutions.
%20(1).jpg)
.jpg)
%20(3).png)














